Man wearing a black cap, round glasses, and a dark green t-shirt standing with hands on hips against a wall with vertical black slats illuminated by teal and purple lights.

When a flow metric becomes a target

Picture a quarterly delivery review that opens with a slide showing four lines. Cycle time is down. Deployment frequency is up. Work in progress has stayed inside its limit for the first time this year. Someone from the portfolio office asks which team should be the example for the others. The team leads go quiet, because they know how their numbers moved. One team has been splitting larger items into tickets that close within a day. Another moved anything blocked by a supplier onto a separate board that the dashboard does not read. A third changed how it plans and reviews work, and its chart looks much like the other two.

None of these teams has falsified anything. Each made a reasonable local choice. The slide still cannot tell the three stories apart. And the question has changed what the chart is for. It used to flag where to look. Now it decides who is held up as the model and, sooner or later, whose budget gets questioned.

What a flow metric is meant to tell you

Cycle time, throughput, work in progress and deployment frequency are useful because they can signal that work is waiting. A team that sees work sitting in review for days has something concrete to talk about. A delivery lead who sees work in progress climbing can ask what is being started and why. In that role the metric is a diagnostic. It tells you that something needs investigating. Finding the actual delay takes workflow-stage data, blocked time or comparable context.

It is also a proxy. Nobody wants short cycle times for their own sake. People want the organisation to deliver useful change predictably, without breaking what already works. Cycle time stands in for part of that goal because it is easier to count. Manheim (2023) describes this gap between a metric and the goal behind it as a normal feature of measurement, and in many settings a tolerable one. A proxy can be imperfect and still useful, as long as nobody pushes hard on the number itself.

How pressure changes the number

The trouble can start when a metric is attached to ranking, reward or compliance. Manheim (2023) treats this as a question of optimisation pressure. Once a number carries consequences, behaviour that moves the number without moving the goal can become worth the effort. Nobody needs bad intent for this to happen. People may respond to what they are judged on, and they usually know their own work better than the dashboard does. Whether they do, and how much, depends on the setting.

In delivery work, much of this response can happen through classification. Someone decides when an item counts as started and when it counts as done. Someone decides whether a defect is a bug, a support request or a small feature. Someone decides whether a large piece of work is one item or six. Each decision is defensible on its own. Under pressure, the defensible option that improves the chart may be the one that wins. Slicing work more finely may also be good practice, which makes the effect hard to spot. Reporting can shift as well: blocked items may move to places the tooling does not count, and status changes may be timed to the reporting cycle. A moving number can therefore reflect genuine improvement, reporting adaptation or a combination of both.

Context gets lost on the way up. A team lead knows that cycle time rose last month because the team took on a migration nobody else wanted. By the time the number reaches a portfolio slide, only a line going the wrong way remains. Leaders who compare teams on aggregated numbers are working without the explanations that would make the comparison fair.

Quality is one place the trade-off can show up. Throughput pressure can encourage a team to test less, defer clean-up or push rework into later tickets. The flow metric improves while the cost may land elsewhere, in incident queues or in other teams' cycle times.

This does not mean every target corrupts every measure. Some targets are tied closely enough to the goal that gaming them is hard, or improving the number genuinely means improving the work. The risk grows with the gap between proxy and goal, and with the stakes attached to the number.

What the software evidence shows, and what it does not

The direct evidence from software organisations is case-based, and it is mixed.

Peacock and Storer (2026) studied DevOps adoption in a single enterprise software organisation and looked beyond the reported measures to how the change played out in practice. Some metrics did improve. The study's point is that the numbers alone did not tell the organisation what had changed or why, and that reading them well required the context of the people doing the work. As a single-organisation case study, it does not isolate whether the metrics, the targets or other parts of the adoption caused the outcomes.

Ayoup et al. (2022) offer a useful counterweight. In their industry case study, a company used gamification to encourage DevOps practices, attaching points and visible achievements to specific behaviours. The company reported faster adoption of some of those practices during the gamification programme. So attaching an incentive to a measure does not automatically ruin it. Design matters: which behaviour is rewarded, how closely it tracks the intended practice and how the scheme is introduced. This is also a single case. It shows what happened in one setting, not what to expect everywhere, and it does not isolate incentive effects or prove delivery gains.

Murphy and Cormican (2015) come at the question from performance management. Their best practice analysis argues for goal-centred performance management in software development that looks at the work as a whole, instead of leaning on isolated output measures. A metric kept close to a stated goal, and read alongside other signals, leaves less room for the number to drift away from what it was meant to show.

Taken together, these sources support a cautious claim. Flow metrics can help, and incentives can sometimes help too. Validity is at risk when a proxy carries consequences and nobody is watching the gap.

Keeping a metric useful under pressure

A flow metric is safest when it informs a named decision, stays connected to a delivery outcome, and is reviewed with the people whose work creates the data.

Each part of that sentence closes off one route to drift. A named decision makes clear what the number is for, so it is harder to reuse quietly for ranking. A connected outcome, such as change failure or customer-reported defects, makes it visible when the flow number improves while quality gets worse. Reviewing it with the team brings back the context that aggregation removes, and the team usually knows first how the number could be gamed. Manheim (2023) makes a similar case in general terms: metrics hold up better when they are combined, revisited and designed with the behaviour they will provoke in mind.

A Monday move

Pick one metric from your current delivery dashboard. Write down the decision it should inform. If you cannot name one, that is already useful information. Add one outcome or quality guardrail next to it, so that any gain in the flow number is read against something it could damage. Then ask the team directly how they could make the number look better without improving delivery. Their answers point to where the proxy is likely to be weakest.

Watch the metric, the guardrail and those answers for four weeks. Treat this as a diagnostic trial, not a proven fix, since the evidence does not show that this sequence works everywhere. It is a low-cost way to check whether your current numbers still measure what you think they measure.

References

Ayoup, P., Costa, D. E., & Shihab, E. (2022). Achievement unlocked: A case study on gamifying DevOps practices in industry. In Proceedings of the 30th ACM Joint European Software Engineering Conference and Symposium on the Foundations of Software Engineering. Association for Computing Machinery. https://doi.org/10.1145/3540250.3558948

Manheim, D. (2023). Building less-flawed metrics: Understanding and creating better measurement and incentive systems. Patterns, 4(10), Article 100842. https://doi.org/10.1016/j.patter.2023.100842

Murphy, T., & Cormican, K. (2015). Towards holistic goal centered performance management in software development: Lessons from a best practice analysis. International Journal of Information Systems and Project Management, 3(4), 23–36. https://doi.org/10.12821/ijispm030402

Peacock, C., & Storer, T. (2026). Beyond the numbers: Evaluating DevOps adoption in an enterprise software development organisation. In Proceedings of the ACM Joint European Software Engineering Conference and Symposium on the Foundations of Software Engineering. Association for Computing Machinery. https://doi.org/10.1145/3803437.3805247

AI disclosure: AI was used to help create this article. Responsibility for the published content remains with Nico Thümler.